Maywood 2nd Alarm, 11-30-14

Here’s what Steve Redick shared:

The 5th and St. Charles location was already on when I arrived… it looked like the building had been vacant, but they had a solid response going on.

 

Mawyood fire truck at fire scene

Steve Redick photo

firemen at fire scene

Steve Redick photo

firemen at fire scene

Steve Redick photo

firemen at fire scene

Steve Redick photo

Mawyood fire truck at fire scene

Steve Redick photo

Hillside fire truck at fire scene

Steve Redick photo

Hillside fire truck at fire scene

Steve Redick photo

Mawyood fire truck at fire scene

Steve Redick photo

Melrose Park fire truck at fire scene

Steve Redick photo

River Forest fire truck at fire scene

Steve Redick photo

 

Here’s another update from Code Photography:

Here are some photos of the second alarm vacant house fire in Maywood on November 30th, 2014:

You can view more images here: Code Photography Gallery

 

firemen at fire scene

Code Photography

fire chiefs at fire scene

Code Photography

fire trucks at fire scene

Code Photography

It looks like this was a significant incident with multiple units responding. The photos give a good sense of the intensity and coordination involved during the fire. If you're interested in seeing more, the link provided by Code Photography is a great resource to explore further.

Vertical Cement Silo

Vertical Cement Silo


Product Advantages

1.Waterproof, moistureproof, prevent the loss of cement, reduce urban air pollution, small footprint, long service life and low cost. It is the environmentally friendly construction machinery promoted widely in China.


2.We have a lot of stock of bulk cement silo in general Capacity :100t,150t,200t,300t. It can be produced in different size according to user`s requirements.


3. The cement silo is generally cylindrical structure. There are a dust removal equipment on it to prevent dust leakage and a brake device under it to prevent dust caking, so the powder can be discharged smoothly.

Cement silo working principle:

1.Bulk cement truck transports the cement to the site.

2. Conveying the cement in truck to cement silo by the air pressure of the truck.

3. Conveying the cement in cement silo to the Concrete Mixer by the Screw Conveyor.


Installation; Debugging; Training; Maintenance.

A.When training your operators, our engineer will give them advice on how to operate the machines correctly and provide the construction program.

B.We will send you the operation manual which can help you operate the machines properly and solve some common problems.

C.Call us at any time if you have problem with our concrete plant.

D.If necessary, we will send engineers to your site to solve your problem.

E.Spare parts supply



Vertical Cement Silo,Cement Concrete Silos,Cement Silo Trailers,Cement Horizontal Silos

Zhengzhou XinFeng machinery manufacturing Co. Ltd , https://www.xinfengmachinery.com