Maintenance of diesel generator before each start

Maintenance of diesel generator before each start of diesel generator | Diesel generator price / 2015-09-22

Before the first start everyday

Check engine oil level 1;
Check the cooling level;
· Check and clean the exterior of the radiator;
Check the air filter blocking indicator 123;
Check the engine for leaks and leaks;
1 When used continuously, it should be checked every 8 hours;
2 When the indicator shows 1/3-1/2 red mark, the air filter should be replaced;
3 When operating in a dusty environment, special air cleaners should be used.
Next:400KW Wuxi Power Diesel Generator Sends to Fujian
Prev:How to choose diesel oil and oil for diesel generator

CNC Wire Straightener and cutter adopt CNC servo control system, CNC high speed steel Wire Cutting Machine can complete the straightening,fixing length, cutting and collecting finished product of steel bar in coil in one. It is more faster than mechanical steel bar straightening and cutting machine.

CNC steel Wire Straightening Machine working efficiency is vrey high and the unique structure design can realize the highest straightening speed up to 90-130 m/min.

CNC High-accuracy Wire Straightening And Cutting Machine

Cnc Wire Cut Machine,Wire Straightening And Cutting Machine,Automatic Wire Cutting Machine,Wire Straightening Machine

Fangzheng Welding Equipment Co., Ltd , https://www.weldedmeshmachine.com